Milton Keynes University Hospital
Specialist healthcare doorsets for advanced surgical environments.
As part of the complete refurbishment of Theatre 2 at Milton Keynes University Hospital, SDS supplied specialist doorsets to support the integration of cutting-edge medical technology. Working with Medical Air Technology, SDS delivered tailored solutions that balanced performance, compliance, and modern design.
About the project.
The refurbishment of Theatre 2 formed part of Milton Keynes University Hospital’s investment in upgrading surgical environments with advanced medical systems. The works required specialist doorsets capable of supporting high infection-control standards, radiation protection, and accessibility features, while maintaining a clean, modern aesthetic.
What our clients have to say.
"SDS were an invaluable partner on the Milton Keynes Theatre 2 refurbishment. They demonstrated a clear understanding of the requirements involved in healthcare environments. The doorsets supplied, including lead-lined doorsets were manufactured to a very high standard and delivered ahead of schedule, giving us flexibility.
Communication throughout the project was excellent, with SDS quick to respond to queries from site, particularly regarding the installation. Their proactive approach and willingness to provide clear technical guidance ensured the installation process ran smoothly, even though this was our first collaboration.
We were very impressed with the quality of both the product and the service, and we look forward to working with SDS on future projects."
Project delivery.
SDS worked closely with Medical Air Technology to supply and install a package of seven high-performance doorsets tailored to the theatre’s requirements.
- Finishes specified in Snowflake with Flint frames, ensuring design consistency and contrast for accessibility.
LRV 21; RAL 7037
- Contrasting edges were incorporated to assist with compliance and inclusive design.
- Ironmongery, including stainless steel kickplates for added durability. In addition to product specification, SDS exceeded client expectations on manufacture and delivery timelines, completing production a week earlier than required and having goods on standby, ready to go before installation.
Strong communication between SDS, the Trust, and the contractor ensured the correct colour selections were maintained across the project.
As this was the first project with this contractor, SDS provided clear guidance on processes and maintained responsive support throughout. Additional architraves were manufactured quickly to align with newly installed screens, ensuring continuity with the new doors.
During installation, SDS responded immediately to site queries, particularly around fitting lead astragals, offering both verbal and written instructions. This clear technical support gave the contractor confidence and peace of mind when working with SDS’s doorsets for the first time.
SDS healthcare doorsets supplied:
Key outcomes and benefits.
- Delivered a tailored package of theatre doorsets to meet both functional and compliance requirements.
- Integrated vision panels and lead-lining providing specialist performance for surgical environments.
- Maintained strong collaboration and communication with Medical Air Technology to support programme delivery and technical requirements.
- Provided immediate assistance with installation queries, ensuring smooth delivery on-site.
- Contributed to the creation of a state-of-the-art surgical facility at Milton Keynes University Hospital.
Summary.
The Milton Keynes University Hospital Theatre 2 refurbishment highlights SDS’s ability to deliver specialist, compliant, and durable door solutions for surgical settings. Through tailored specifications, including lead shielding, contrasting finishes and infection-control detailing, SDS played a key role in supporting the hospital’s drive to provide world-class surgical care.